The standing documents
- The fire NOC or provisional approval, current, matching the building as it stands today.
- Approved drawings reflecting the current layout — a mezzanine added after approval is a common and serious mismatch.
- Records for the installed systems: hydrants, sprinklers, detection and alarm, pumps, emergency lighting.
The recurring records
This is where most sites fall short — not because nothing is done, but because what was done was not written down at the time.
- Extinguisher servicing, with refill dates and pressure checks against a numbered inventory. An extinguisher not on the list is as much a finding as one out of date.
- Pump testing on schedule, including the diesel pump under load rather than a start-up check.
- Drills, with date, evacuation time, headcount reconciliation and what went wrong. A drill record with no problems recorded is not usually a successful drill.
- Training for the emergency response team and floor wardens, with names that match the current roster rather than people who left.
Where sites are most often exposed
Blocked or locked escape routes are the finding with the most serious consequence and the simplest cause: storage creep. A route that was clear at commissioning accumulates pallets over months and nobody registers it as a change.
Assembly points are the other one. They are frequently still marked where they were before a building extension, sometimes now inside the risk area, and headcount lists are out of date.
A practical rhythm
Monthly: a walk of escape routes and extinguisher positions against the inventory. Quarterly: systems testing and a drill. Annually: a full review against the approval and whatever the state rules require for renewal. Keep the records in one place with dates, not in three people's inboxes.
The inspection is usually straightforward for a site that already runs this rhythm. The difficulty comes from assembling a year of evidence in the week before.