GST REGISTERED BUSINESS
ML Consultancy logo
MLC
QEHS AT ONE PLACE
Get a Free Consultation
HomeAbout Us
Services
All Services
Statutory Compliance
Overview: Statutory Compliance
Commercial ComplianceProfessional Tax
Electrical ApprovalsCEIG Approval
Factory ComplianceFactory Licence
Fire ComplianceFire NOC
Auditing
Overview: Auditing
Certification
Overview: Certification
Documentation
Overview: Documentation
Fire Equipment
Overview: Fire Equipment
PPE's Supply
Overview: PPE's Supply
MLC Trainings
Overview: MLC Trainings
MLC Services
All MLC ServicesEmployee HealthESGGMP AuditHAC ServicesIndustrial HygieneGMP Quality ConsultingIncident InvestigationPharma Cleanroom EquipmentPower System StudiesQuality ConsultationPlant Setup & UpgradationRespiratory & Emergency ProtectionSafety StudiesSupplier Qualification AuditQEHS Software Services
Certifications
Resources
All ResourcesBlogKnowledge BankCalculator Hub
GalleryFAQContact UsMLC Brochure (PDF)Get a Free Consultation →
Statutory Compliance7 min read

Fire NOC

Support enquiries relating to fire-authority approvals and the fire-safety arrangements of a premises.

CategoryStatutory Compliance
CoveragePan-India support
AssuranceISO 9001:2015 · 14001:2015 · 45001:2018 certified consultancy
Next stepFree first consultation
Jump to section
  1. Overview of Fire NOC
  2. Types of Fire NOC Certificate
  3. Structures for which Fire NOC Certificate is required
  4. Terminology related to Fire NOC
  5. Documents required for Fire NOC Certificate
  6. Stages in Fire NOC Application
  7. Category-wise details of site Inspection, Review and Grant of NOC
  8. How will MLC Assist You?
  9. FAQ

Overview of Fire NOC

Fire NOC is required for industries, residential buildings, educational buildings and high-risk buildings. The NOC is meant to ensure that safety and construction specifications mandated by the state for specific establishments are followed during the construction and all fire safety devices are installed. Many states have their own Fire Service Acts.

Fire NOCs must be obtained for setting up new industries/establishments for carrying out business/manufacturing and storing dangerous, hazardous, flammable, explosive items in the factory premises where the units are housed. The National Building Code of India covers detailed construction, maintenance and fire safety guidelines.

It is published by the Bureau of Indian Standards (BIS), and it was a recommendatory document. After new guidelines were issued to the States to incorporate the recommendations of the National Building Code (NBC) into their local building bylaws, the recommendations of NBC of India was made a mandatory requirement.

BIS also issued advisories in 2017 to all the State Governments to incorporate and implement the National Building Code of India 2016 Part – IV, "Fire & Life Safety", in their building bye-laws.

Types of Fire NOC Certificate

Provisional Certificate: A provisional Fire NOC certificate is issued before the actual construction of the project starts. A provisional certificate ensures that the construction plan follows all rules made by the fire department.

Final Certificate: This certificate is issued before the occupancy certificate. The NOC department ensures that all the conditions in provisional NOC are fulfilled and all firefighting devices are in place and then only a final Fire NOC is issued.

Structures for which Fire NOC Certificate is required

Fire Certificate will be required from the respective fire department for the following :

  • Industrial Establishments
  • Hospitals
  • Corporate Buildings
  • Multiplex and Malls
  • Mercantile Business
  • Assembly Buildings
  • Hotels
  • Educational Institutes
  • Telephone Exchange
  • Custodial Organizations
  • Storage Structures with High Dangers
Automatic Fire Detection and Alarm System
System with the capacity to automatically detect fire.
Combustible Material
Materials which either are combustible or add heat to fire.
Fire Door
A fire resistive door approved for openings in fire separation.
Fire Lift
The lift that is installed to enable fire service personnel to reach different floors.
Fire Load
Calorific energy of the entire contents contained in space, including facings of walls, partitions, floors, and ceilings.
Fire Load Density
It is the fire load divided by the floor’s area.
Fire Resistance Rating
Time through which a material will withstand the standard fire exposure.
Fire Separation
Distance measured from the external wall of a building to the external wall of another building on its side.
Fire Stop
A fire-resistant material or construction with a fire-resistant rating of fire separating elements installed in concealed spaces to prevent spreading.
Emergency Lightening
Backup lighting for use when the supply to normal power fails.
Means of Egress
An unobstructed and continuous way of travel from any point in a building to a place of comparative safety.
Stack Pressure
Pressure difference due to temperature difference creates air movement within a duct chimney or enclosure.
Venting Fire
The process of inducing heat and smoke to leave a building quickly to check the lateral spread of fire and heat.
Wet Riser
An arrangement of firefighting within the building that uses vertical rising mains not less than 100 mm nominal diameters with landing valves on each floor.

Documents required for Fire NOC Certificate

Specific documents that are required to be submitted to the fire department along with the form to obtain the certificate of Fire NOC :

  • Two copies of building plans.
  • Key Plan
  • Floor Plan
  • Floor-wise Fire Fighting Plan
  • All Fire Fighting Plan
  • Front Elevation
  • Side Elevation
  • Typical Floor Plan
  • Site Plan
  • Floor-Wise Plan
  • Project Report
  • The certificate of building stability
  • Architecture checklist certificate
  • Address Proof
  • The photograph of the building from outside
  • Electronic wiring certificate from a recognized agency

Stages in Fire NOC Application

After receiving the application with the above documents, the request is forwarded to the Chief Officer of the Fire Services Department who inspects the site regarding incorporating all the firefighting and related devices and submits an inspection report to the concerned authority of the department, which issues the No Objection Certificate. The detailed process is given in the table below.

Filing NOC Application and Document SubmissionSite InspectionIssuance of Licence
To obtain a fire NOC, the applicant can apply through the official website of the relevant state's fire service department or in offline mode by filling out the Fire NOC form along with all requisite documents.The inspecting inspector visits the premise and verifies if safety equipment is installed along with the arrangement for Fire Safety like smoke alarms, fire escape route etc. The applicant will be asked to do the same if the application requires clarification.Only after successfully completing all formalities, safety measures and resolution of queries, the NOC will be issued. The time taken to obtain the Fire NOC is 15 days to 30 days.

Category-wise details of site Inspection, Review and Grant of NOC

The following table gives the details of the Inspection officer and Reviewing Officer and the Fire NOC issuing authorities as per the category of the building

For Commercial Buildings
Building CategoryConditionInspecting OfficerReviewing OfficerNOC Issuing Officer
D-6 Building - having mixed occupancies of assembly and mercantile-FSO/CFODDJD
G-1 Building used for low hazard industriesLess than 18 meterFSOCFOCFO
G-2 Building used for moderate hazard industryLess than 18 meterFSOCFODD
G-3 Building used for high hazard industriesLess than 15 meterFSO/CFODDJD
For Commercial Buildings
Building CategoryConditionInspecting OfficerReviewing OfficerNOC Issuing Officer
A-4 Apartment HousesLess than 15 mFSOCFPCFO
15 to 60 mFSOCFOCFO
60 to 100 mFSOCFODD
More than 100 mFSO/CFODDJD
A-5 HotelsUp to 30 mFSOCFOCFO
More than 30 mFSOCFODD
A-6 Starred Hotels—FSOCFODD

How will MLC Assist You?

  1. Legalities concerning your Business and the Environment

    We provide one-stop support for your legal requirements concerning Fire NOC and other Licences and permits required by your Business.

  2. Expert advice all along the way

    We ensure that our client business complies with every regulation and guideline by keeping track of regulatory changes and informing our clients of the needed actions.

  3. Precise and Swift Assistance

    MLC experts ensure that our clients' queries are resolved swiftly and their interactions with our executives are precise and hassle-free.

FAQ

Which buildings need a Fire NOC?

A Fire NOC is required for industrial establishments, hospitals, corporate buildings, malls and multiplexes, mercantile and assembly buildings, hotels, educational institutes, telephone exchanges, custodial organisations and high-hazard storage structures.

What is the difference between a provisional and a final Fire NOC?

A provisional certificate is issued before construction starts, to confirm the plan follows fire department rules. The final certificate is issued before the occupancy certificate, once all conditions are met and firefighting devices are in place.

What documents are needed for a Fire NOC?

Key documents include building plans (key, floor, firefighting, elevation and site plans), the project report, a building stability certificate, an architecture checklist certificate, address proof, a photograph of the building and an electrical wiring certificate from a recognised agency.

How long does it take to get a Fire NOC?

Once all formalities, safety measures and queries are completed, the Fire NOC is typically issued in 15 to 30 days.

What happens during the Fire NOC inspection?

The inspecting officer visits the premises to verify that safety equipment, smoke alarms, fire escape routes and other fire-safety arrangements are in place, and reports to the authority that issues the NOC.

Is the National Building Code mandatory for fire safety?

Yes. States were directed to incorporate the National Building Code of India 2016 Part IV, Fire and Life Safety, into their building bye-laws, making its recommendations mandatory.

Who needs a Fire NOC?

Industries, residential, educational and high-risk buildings — including hospitals, corporate buildings, malls, hotels, assembly buildings and storage structures with high dangers. It is also required to set up new establishments that store hazardous, flammable or explosive items.

What documents are required for a Fire NOC?

Two copies of building plans (key, floor, fire-fighting, elevation and site plans), a project report, a building stability certificate, an architecture checklist certificate, address proof, a photograph of the building and an electrical wiring certificate from a recognised agency.

Can a Fire NOC be applied for online?

Yes. Apply through the official website of the state's fire service department, or offline with the Fire NOC form and the required documents.

Support enquiries relating to fire-authority approvals and the fire-safety arrangements of a premises.

Fire NOC

WhatsApp
MLC Brochure
Free · no sign-up

MLC Brochure: everything ML Consultancy does, in one document.

  • The full service catalogue, by category
  • ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates with numbers
  • Sector experience and the founder's credentials

Useful when someone internally asks "who are these people?" before a call.

Downloads immediately. We use this to send the brochure and follow up once — no list, no forwarding.

A short note is enough. We reply within one working day.